ENERGY CONSULTING
Our expert opinion is the success of your RES project
Commercial connection of RES projects
IN-OR-OUT analysis of a RES project
STAY-OR-OUT analysis of a RES project
Cable Pooling Analysis
We conduct proceedings with the DSO/OSP for commercial connection of RES projects (pursuant to Article 7, paragraph 9 of the Energy Law) to the order and under the power of attorney.
The service in this regard is performed exclusively on the basis of a previously performed by us analysis of the assessment of the possibility of connecting a RES project to the DSO/OSP network of the STAY-OR-OUT type and a possible audit of the power grid elements provided for modernization in the analysis, as well as preliminary designs of the scope of their modernization.
When estimating the value of the necessary modernization of grid elements, conditioning the possibility of connecting a RES project in a commercial mode, we indicate the cost of modernization leveling the existing congestion in the grid and the cost of its modernization resulting from the impact of the RES project planned for connection.
IN-OR-OUT – reducing investment risk at an early stage of the development process.
The expertise limits making a serious mistake in selecting a location for a renewable energy project, allowing you to exclude locations with a low potential for obtaining connection conditions in the standard and commercial formula (Article 7, section 9, Energy Law). The analysis determines the optimal location for connecting the RES project and the base load of the DSO/TSO network elements in the area observed for this location, which, if they are found to be significantly overloaded, eliminates the RES project from the investment process as too risky.
The expert opinion is also worth using in the event of a refusal to issue connection conditions for a renewable energy project, as a preliminary analysis eliminating the renewable energy project from further, full and more expensive assessment of the scope of the necessary modernization of the DSO/TSO network in order to connect the renewable energy project in a commercial mode, STAY-OR-OUT type.
STAY-OR-OUT – full analysis of the connection potential of the RES project
The results of this study determine, with great approximation, the scope and value of the necessary modernization of the DSO/TSO power grid, which determines the connection of the RES project in a commercial mode (in accordance with Article 7, section 9, Energy Act), also taking into account the cost of the connection itself, including the cost : connecting the power supply to the GPZ or power line, construction of the GPZ and the connection cable.
The analysis is based on the assessment of operation normal state (n) and emergency states of the power grid operation (n-1) and ( assesses the selection of the most optimal variant of connecting the RES project to the DSO/TSO power grid in terms of estimated costs of necessary modernization of network elements, analyzing various variants of connection location and connection power, also determining maximum connection power for the optimal scope of DSO/OSP modernization.
In this expert opinion, we perform a complete analysis of the assessment of the possibility of connecting 2 RES projects (or RES and an energy storage) to the DSO/TSO power grid, as in the case of the STAY-OR-OUT study, and combined with an estimate of the value of the necessary modernization of elements of the DSO/TSO power grid, conditioning the connection of a renewable energy project in a commercial mode (pursuant to Article 7, section 9 of the Energy Law).
If the existing RES (or energy storage facility) has issued connection conditions for a single energy source, we assess the possibility of connecting another RES (or energy storage facility) to the DSO/TSO network, taking into account changes to the issued connection conditions, as a result of which we prepare a new application for changing the conditions of connection to the DSO/TSO power grid for a hybrid RES source or energy storage.
Other services
Commercial connection of RES projects
We conduct proceedings with the DSO/OSP for commercial connection of RES projects (pursuant to Article 7, paragraph 9 of the Energy Law) to the order and under the power of attorney.
The service in this regard is performed exclusively on the basis of a previously performed by us analysis of the assessment of the possibility of connecting a RES project to the DSO/OSP network of the STAY-OR-OUT type and a possible audit of the power grid elements provided for modernization in the analysis, as well as preliminary designs of the scope of their modernization.
When estimating the value of the necessary modernization of grid elements, conditioning the possibility of connecting a RES project in a commercial mode, we indicate the cost of modernization leveling the existing congestion in the grid and the cost of its modernization resulting from the impact of the RES project planned for connection.
IN-OR-OUT analysis of a RES project
IN-OR-OUT – reducing investment risk at an early stage of the development process.
The expertise limits making a serious mistake in selecting a location for a renewable energy project, allowing you to exclude locations with a low potential for obtaining connection conditions in the standard and commercial formula (Article 7, section 9, Energy Law). The analysis determines the optimal location for connecting the RES project and the base load of the DSO/TSO network elements in the area observed for this location, which, if they are found to be significantly overloaded, eliminates the RES project from the investment process as too risky.
The expert opinion is also worth using in the event of a refusal to issue connection conditions for a renewable energy project, as a preliminary analysis eliminating the renewable energy project from further, full and more expensive assessment of the scope of the necessary modernization of the DSO/TSO network in order to connect the renewable energy project in a commercial mode, STAY-OR-OUT type.
STAY-OR-OUT analysis of a RES project
STAY-OR-OUT – full analysis of the connection potential of the RES project
The results of this study determine, with great approximation, the scope and value of the necessary modernization of the DSO/TSO power grid, which determines the connection of the RES project in a commercial mode (in accordance with Article 7, section 9, Energy Act), also taking into account the cost of the connection itself, including the cost : connecting the power supply to the GPZ or power line, construction of the GPZ and the connection cable.
The analysis is based on the assessment of normal state (n), and emergency states of the power grid operation (n-1) and assesses the selection of the most optimal variant of connecting the RES project to the DSO/TSO power grid in terms of estimated costs of necessary modernization of network elements, analyzing various variants of connection location and connection power, also determining maximum connection power for the optimal scope of DSO/OSP modernization.
Cable Pooling Analysis
In this expert opinion, we perform a complete analysis of the assessment of the possibility of connecting 2 RES projects (or RES and an energy storage) to the DSO/TSO power grid, as in the case of the STAY-OR-OUT study, and combined with an estimate of the value of the necessary modernization of elements of the DSO/TSO power grid, conditioning the connection of a renewable energy project in a commercial mode (pursuant to Article 7, section 9 of the Energy Law).
If the existing RES (or energy storage facility) has issued connection conditions for a single energy source, we assess the possibility of connecting another RES (or energy storage facility) to the DSO/TSO network, taking into account changes to the issued connection conditions, as a result of which we prepare a new application for changing the conditions of connection to the DSO/TSO power grid for a hybrid RES source or energy storage.
Other services
PROJECTS AND EXPERTISE DEPARTMENT
The service is provided by an experienced team of designers and analysts in the energy industry.